English
Hungarian

References: Technological Operation

Picture icon NI Hungary Ltd. (Debrecen)
Overall technological operation, implementation of technological systems (from 2001)

Picture icon Sodexo Hungary Ltd. (Debrecen)
10 technological operation of 10 kitchens (from 2003)

Picture iconDebrecen University ATC (Debrecen)
Operation, maintenance and repair of building machinery, electric-automatic equipments, (from 2003 to 2008)

Picture iconSulzer-Hungaerotech Ltd. (Debrecen)
Operational, maintenance and repair works of electric-automatic systems, equipments (from 2004)

Picture iconHalköz Shopping Center (Debrecen)
Technological operation, operation of parking lot, cleaning, gardening (from 2004 to 2008)

Picture iconJABIL Global Service (Szombathely)
Overall technological operation, implementation of technological systems (from 2005 to 2008)

Picture iconLasselsberger-Knauf Ltd. (Debrecen)
Overall technological operation (from 2006)

Picture iconHungarian National Bank (Budapest)
Operation of boiler room and reconstructed machinery systems (from 2006 to 2008)

Picture iconPoligen V Ltd. (Hajdúböszörmény)
Operation of gas-engine block heating power station (from 2006 to 2009)

Picture iconDip Invest Ltd. (Debrecen)
Operation of electric-automatic and building machinery systems (from 2007l)

Picture iconBridgestone Tatabánya Production Ltd. (Környe)
operation of technological gas-boiler room (from 2007 to 2009)

Picture icon Hanna Apartmanház (Hajdúszoboszló)
Overall technological operation, operation of car-park, cleaning, gardening (from 2008 to 2010)

Picture iconDebrecen University OEC II. Dorm (Debrecen)
Technological operation (2008-2009)

Picture iconRR Donelley Hungary Ltd. (Debrecen)
Overall operation of electric-automatic systems, equipments (from 2010)

Picture iconPannon-Effekt Ltd. (Debrecen)
Cooler system periodic maintenance work

Picture iconPOPZ Europe Ltd. (Debrecen)
overall operation of electric-automatic systems, equipments (from 2011)

Picture icon NI Hungary Ltd. (Debrecen)
Sprinkler system monitoring, maintenance (from 2012)

Picture iconInkubátorház Logistic Hall (Debrecen)
Building machinery and electric technological supervision (from 2012)


References: Execution

Picture iconNI Hungary Ltd. (Debrecen)
Implementation of bicycle storage (2002)

Picture iconNI Hungary Ltd. (Debrecen)
Implementation of cooling system at the technological water manager (2003)

Picture iconKenézy Gyula Hospital (Debrecen)
Electric automatic mounting of air technology systems (2003)

Picture iconPoultry Processing (Petneháza)
Execution works of the electric automatics of building machinery system, building control network (2003)

Picture iconCellplast Ltd. (Hajdúszoboszló)
Technological design and execution of insulation material blocking equipment (2004)

Picture iconNI Hungary Ltd. (Debrecen)
IDF room (2005)

Picture iconNI Hungary Ltd. (Debrecen)
implementation of 4. 5 row energy pith in the production hall (2005)

Picture iconOTP Bank Branch (Debrecen)
Air technology electric automatic system implementation (2005)

Picture iconSzoboszlói road Elementary School (Debrecen)
Boiler room reconstruction, modification of heating system (2006-2007)

Picture iconTherapy house (Debrecen)
Boiler room reconstruction (2006)

Picture iconKözép street kindergarten (Debrecen)
Boiler room reconstruction (2006)

Picture iconHungarian National Bank (Budapest)
Modernization and renovation of boiler room and heating center general design and exceptional works (2006)

Picture iconNI Hungary Ltd. (Debrecen)
Implementation of pneumatic compressor (2006)

Picture iconNI Hungary Ltd. (Debrecen)
building machinery mounting works and execution of building control system at the execution of building "B" (2007)

Picture iconNI Hungary Ltd. (Debrecen)
When enlarging storage building, execution of high voltage works, implementation of building control system (2008)

Picture iconSodexo Ltd.
LEGO building (Nyíregyháza, Industrial Park) – Implementation of Fan-Coil equipments (2008)

Picture iconNI Hungary Ltd. (Debrecen)
Implementation of calibration laboratory (2008)

Picture icon Lasselsberger-Knauf Ltd.
Technological system modification, development (2008-2009)

Picture icon Friesland Zrt. (Debrecen)
Boiler room technological system renovation, implementation of new boilers, implementation of building control system (2009)

Picture icon Cellplast Ltd. (Hajdúszoboszló)
chopped-wood heated steam boiler (2000 kg/h) installation with associated server system (2008-2009)

Picture icon KITE Zrt. (Derecske)
Agricultural site, implementation of the heating system of 25 walk-in plastic tunnels (2009)

Picture iconNádudvari Food Industry Ltd. (Nádudvar)
Boiler room reconstruction, building out power-line, reconstruction of heat centers (2009)

Picture iconXanga Kft. Printing Building (Debrecen)
Mounting of air technology systems (2009)

Picture iconNI Hungary Ltd. (Debrecen)
Different machine installations, technological changes and other construction works (from 2001)

Picture iconNémeth László Grade School and Kindergarten (Bocskaikert)
Complete building machinery renovation, expansion works and utilities network construction (2009)

Picture icon Agri Corn Ltd. (Monostorpályi)
UNIFERRO biomass-heated boiler (2MW) executing overall machinery and electric automatic implementation works (2009)

Picture iconSemmelweis Ignác Medical Center (Miskolc)
Boiler installation, boiler complete mechanical renovation (2009)

Picture iconVeres Péter High School and Vocational School (Balmazújváros)
Complete building expansion and renovation works, boiler installation, obstacle clearing (2010)

Picture icon Veres Péter High School and Vocational School (Balmazújváros)
Complete building expansion and renovation works, boiler installation, obstacle clearing (2010)

Picture icon Cellplast Ltd. (Hajdúszoboszló)
Boiler (1 t/h) installation for technological goals (2010)

Picture icon Nádudvari Food Industry Ltd. (Nádudvar)
Dairy energetic reconstruction, boiler room building, conversion of heating systems and other engineering and construction works (2010)

Picture iconKindergarten-nursery (Tiszacsege)
Implementation of heat pump and solar collectors, as well as implementation of public utility network (2010)

Picture icon Kindergarten-nursery (Tiszacsege)
Implementation of heat pump and solar collectors, as well as implementation of public utility network (2010)

Picture icon Nádudvari Food Industry Ltd.
Meat Processing Plant energetic reconstruction, rapid steam boiler installation, boiler conversion, engineering and construction works (2010)

Picture iconMOL (Hajdúszoboszló)
Energy-rationalization, gas-mounting and heating works, with implementation of boiler (2010)

Picture iconFiúnevelő Intézet (Aszód)
Boiler room complete mechanical renovation (2010)

Picture iconKölcsey Ferenc High School, Grade School and Mayor's Office (Nyíradony)
obstacle clearing, plumbing renovation (2010)

Picture iconBlock of flats (Debrecen)
Upgrading Heating (ECO-tender) (2010)

Picture iconWastewater Treatment Plant (Debrecen)
Building machinery and technology works (2010)

Picture iconMERCEDES-BENZ (Kecskemét)
Admin building heating-cooling mounting work execution (2011)

Picture iconArany János Grade School (Ebes)
Building extension, building- and kitchen machinery works (2011)

Picture icon Magyar Sajt Ltd. (Ebes)
Pipe mounting and insulation works of technological systems (water- ice water-, steam- and condensed water conduit, gas conduits, etc.) (2011)

Picture iconKenézy Gyula Hospital (Debrecen)
Emergency Department water and collection- heating and aeration mounting works)

Picture icon Aqua-park (Balmazújváros)
Implementation of overall building machinery mountings at the development works (2011)

Picture iconLIDL Department Store (Berettyóújfalu)
engineering works in Bakery (2011)

Picture iconNI Hungary Ltd. (Debrecen)
Upgrading of compressor house and screwcompressor installation (2011)

Picture icon NI Hungary Ltd. (Debrecen)
Cooling system conversion (Building B), natural cooling system installation (2011)

Picture iconMÁV station (Újszász)
Railway station building machinery construction (2012)

Picture iconKőkultúra Bükk Southern Gate Visitor Center (Cserépfalu)
Implementation of HVAC (2012)

Picture iconPig breeding colonies (Nádudvar)
Animal husbrandy and feeding technology, building construction (2012)

Picture iconNI Hungary Ltd. (Debrecen)
Air-handling system development in the product hall(2012)


References: Technological Design, Preparing Expert's Report, Technological Supervision

Picture iconBalmazújváros Old-age home (Balmazújváros)
Preparation of electric design (1999)

Picture iconSátoraljaújhely Heating Power Station Ltd. (Sátoraljaújhely)
Block heating power station machinery and electric design (2001)

Picture iconGyulai Meat Processing Plant Rt. (Gyula)
Preparation of electric design for heat-energetic reconstruction and gas-engine block heating power station implementation (2001)

Picture iconLétavértes Elementary School (Létavértes)
Preparation of electric design for reconstruction (2002)

Picture iconVirágoskúti Horticulture (Balmazújváros)
Preparation of electric design for processing plant (2002)

Picture iconHajdúszoboszló Sport street 60 flat building
Preparation of electric design (2004)

Picture iconHajdúszoboszló, Bethlen street 30 flat building
Preparation of electric design (2005)

Picture iconXanga Ltd. Industrial halls (Debrecen)
Building machinery and electric technological supervision (2008-2012)

Picture iconXimple Kft. Industrial halls (Debrecen)
Building machinery and electric technological supervision (2008-2009)

Picture iconSodexo Kft. LEGO building (Nyíregyháza)
Overall technological survey of the buildings, preparing expert's report 2008)

Picture iconXanga Ltd. Printing hall (Debrecen)
Building machinery and electric technological supervision (2009)

Picture iconXanga Ltd. (Debrecen)
POPZ Hall building machinery and electrical technological supervision (2011)


References: Development, Rationalization of Energetic Systems, Project Management

Picture iconZAB-GÁZ Rt. (Sátoraljaújhely)
Preparation of energetic study for exploring the possibilities of the implementation of a gas engine (2000)

Picture iconTarjánhő Ltd.
Project management of gas-engine block heating power station implementation direction of gas-engine block heating power station (2000)

Picture iconJávorszky Ödön Hospital (Vác)
Project management of the implementation of gas-engine block heating power station (2002)

Picture iconSzent Lázár Hospital (Salgótarján)
Project management of gas-engine block heating power station implementation (2002)

Picture iconAGRO-CHEMI Kft. (Budapest)
Project management of the implementation of gas-engine block heating power station (2003)

Picture iconNI Hungary Ltd. (Debrecen)
Building out electric capacity-management system at the building supervision (2004)

Picture iconNI Hungary Ltd. (Debrecen)
Heat-utilization of compressors (2007, 2012)

Picture iconNI Hungary Ltd. (Debrecen)
Upgrading cooling system and installation of natural cooler (2011)

Picture iconNI Hungary Ltd. (Debrecen)
Compressor housing development, waste heat recovery (2011)

Picture iconCellplast Kft. (Hajdúszoboszló)
Implementation of chopped-wood heated steam boiler (2000 kg/h) with the connected (2008-2009)

Picture iconNI Hungary Ltd (Debrecen)
B building reconstruction of cooling system (2011)